The COHERENT Experiment at the Spallation Neutron Source, Oak Ridge National Laboratory
-
-
CsI[Na] Construction
-
-
LAr Detector
-
-
SNS at ORNL
-
-
Quenching Factor Measurements
-
-
SciBath Neutron Detector
-
-
HPGe Testing
-
-
Lead Casting for Nubes
-
-
Nubes
-
-
NaI[Tl] Testing
-
-
Placing the CsI detector. First handheld neutrino detector?
-
-
CsI, halfway there.
-
-
CsI, inside the neutron shield.
-
-
Installing muon veto for CsI.
-
-
Buttoning up CsI shield.
-
-
One last brick for CsI.
-
-
Collaboration Photo March 2014
-
-
Finishing up the CsI installation.
-
-
Creative solutions.
-
-
Collaboration Photo February 2016
-
-
Lead stockpile at TUNL for COHERENT.
-
-
The Pb neutrino cube, and it’s mini.
-
-
NaI-185 all wrapped up and ready to go.
-
-
Setting up the base of the NaI-185 detector.
-
-
First data on the NaI-185 detector.
-
-
All three neutrino cubes are operational!
-
-
A nice hairdo for NaI-185.
-
-
Installing detectors for NaI-185.
-
-
Routing cables for the NaI-185 detector.
-
-
First signals for the NaI-185 detector.
-
-
Routing cables for the Pb neutrino cube..
-
-
Delivery of the Pb neutrino cube to the SNS.
-
-
Almost done with the Pb neutrino cube.
-
-
Putting the hat on the Pb neutrino cube.
-
-
Pb neutrino cube detectors and muon vetos.
-
-
Neutrino Alley is long.
-
-
-
Students fixing PMT bases onsite.
-
-
Saying goodbye to the Pb neutrino cube.
-
-
Shipping the Pb neutrino cube
-
-
Installation of the Pb neutrino cube.
-
-
A view from the top of the neutrino cubes.
-
-
Collaboration Photo February 2017
-
-
A visit to a spare Hg target.
-
-
Collaboration Photo August 2016
-
-
Graduate students visiting the detectors.
-
-
LAr Team members
-
-
Data acquisition
-
-
Looking at data
-
-
ORNL team members
-
-
UChicago team
-
-
Duke/TUNL team leaders
-
-
LAr PMT