Facility Resources
Nanaline North Facility – Pentair Aquatic Eco-Systems facility built in 2003 with an expansion in 2008. This is a 1,685 sq. ft. facility housing 61 racks. Has fully equipped procedure room with six microscope stations, heat shock room, and mutagenesis area.
Nanaline South Facility – Pentair Aquatic Eco-Systems facility built in 2010. This is a 1,511 sq. ft. facility housing 49 racks. Has fully equipped procedure room with ten microscope stations and a separate environmental room equipped with two photoperiod cabinets.
CARL Facility – Pentair Aquatic Eco-Systems facility built in 2013. This is a 761 sq. ft. facility housing 32 racks.
Downtown Facility – Tecniplast facility built in 2014 (phase 1). This is a 3,150 sq. ft. facility expected to eventually hold 73 racks, it currently holds 38 racks. Has a fully equipped microscope room with 14 microscope stations, fluorescence room, heat shock room, and 18 photoperiod cabinets.
Stickleback Facility – Aquaneering facility built in 2018. This is a ~360 sq. ft. facility housing 66 tanks.