Facility Resources

Nanaline North FacilityPentair Aquatic Eco-Systems facility built in 2003 with an expansion in 2008.  This is a 1,685 sq. ft. facility housing 61 racks.  Has fully equipped procedure room with six microscope stations, heat shock room, and mutagenesis area.

Nanaline South FacilityPentair Aquatic Eco-Systems facility built in 2010.  This is a 1,511 sq. ft. facility housing 49 racks.  Has fully equipped procedure room with ten microscope stations and a separate environmental room equipped with two photoperiod cabinets.

CARL FacilityPentair Aquatic Eco-Systems facility built in 2013.  This is a 761 sq. ft. facility housing 32 racks. 

Downtown FacilityTecniplast facility built in 2014 (phase 1).  This is a 3,150 sq. ft. facility expected to eventually hold 73 racks, it currently holds 38 racks.  Has a fully equipped microscope room with 14 microscope stations, fluorescence room, heat shock room, and 18 photoperiod cabinets.

Stickleback FacilityAquaneering facility built in 2018.  This is a ~360 sq. ft. facility housing 66 tanks.